Team Workload
Capacity utilization, assignee breakdown, and sprint load · Sprint 24
Under capacity (<80%)
Near capacity (80–100%)
Overloaded (>100%)
Team Utilization · Sprint 24
Assigned story points vs 20pt sprint capacity per member
Capacity: 20 pts/sprint
AK
Arjun
Tech Lead
Capacity90%
18/20 pts
In Progress
3To Do
2Blocked
0PS
Priya
Senior Engineer
Capacity120%
24/20 pts
In Progress
4To Do
3Blocked
1MW
Marcus
Senior Engineer
Capacity110%
22/20 pts
In Progress
4To Do
2Blocked
1LW
Li
Mid Engineer
Capacity70%
14/20 pts
In Progress
2To Do
2Blocked
0SR
Sofia
Senior Engineer
Capacity130%
26/20 pts
In Progress
5To Do
2Blocked
0DP
Dev
Mid Engineer
Capacity80%
16/20 pts
In Progress
3To Do
1Blocked
1Workload Breakdown
| Role | To Do | Done | Sprint | |||||
|---|---|---|---|---|---|---|---|---|
SR Sofia Reyes | Senior Engineer | 5 | 2 | 0 | 5 | 26/20 | 130% | SP-24 |
PS Priya Sharma | Senior Engineer | 4 | 3 | 1 | 6 | 24/20 | 120% | SP-24 |
MW Marcus Webb | Senior Engineer | 4 | 2 | 1 | 7 | 22/20 | 110% | SP-24 |
AK Arjun Kapoor | Tech Lead | 3 | 2 | 0 | 8 | 18/20 | 90% | SP-24 |
DP Dev Patel | Mid Engineer | 3 | 1 | 1 | 5 | 16/20 | 80% | SP-24 |
LW Li Wei | Mid Engineer | 2 | 2 | 0 | 5 | 14/20 | 70% | SP-24 |